What you quote isn't how long it takes

Having well-calculated standard times is useless if nobody compares, yet, how long the machine actually took to make the part.

Leer en español →

Quoting with times that nobody has checked against the plant floor is one of several ways a business loses money without seeing it. If your quote uses a standard time nobody has compared with actual floor time, that quote is guessing, not calculating.

The system that has the number, just not the one that matters

There's a version of the problem that's easy to dismiss: "we don't have our times calculated properly." But there's a more uncomfortable version, the one that actually affects more companies: having well-calculated standard times, with a serious system behind them, and still not knowing whether those times look anything like what really happens on the floor.

The gap an ERP still in development hasn't closed

In discovery conversations with companies that already have an ERP with a manufacturing module in development, this pattern comes up directly. Someone responsible for production planning described it this way: "we have the standard times so we can quote, but we still haven't captured the actual times in the system." It isn't that the standard data is missing. It's that nobody is closing the loop between what was assumed when quoting and what actually happened on the machine.

Why finishing the ERP doesn't solve this on its own

It's tempting to think that once the manufacturing module is fully implemented, the problem will solve itself. But standard time and actual time are two different captures, made at different moments, by different people, and no system reconciles them automatically unless someone designs that step explicitly. A more complete ERP can actually inspire more confidence than it should, if nobody has yet checked that the standard time feeding the quotes is still true.

How to start closing the loop

You don't need to wait for the manufacturing module to be finished. Pick a product you quote often and compare, across the last ten orders, the standard time used to quote it against the time the floor reported it took to make. If the ten comparisons are close, the standard is still reliable. If they drift apart, you've already found a product whose quote is probably wrong, even if the system that generated it is excellent.

From standard time to actual time

ItemValue
Standard time used to quote100%
Difference from the actual time captured on the floorvariable, different by product and by line
Real labor and machine cost of that partwhat it actually took to make it

A standard time that has never been checked against the floor isn't a mistake; it's simply an assumption. The problem starts when that assumption is treated as if it were a confirmed fact.

What this is not

This example is an anonymized synthesis of a discovery conversation with someone responsible for production planning, not audited data from an active pilot. It's presented this way on purpose, with no specific figures attributed to a company, because the goal is to illustrate the pattern, not to report a confirmed case.

A good standard-time system is a necessary starting point. On its own, it's no guarantee that those times are still true once the part has actually been made.