Taking any order that "at least covers fixed costs" seems prudent. In practice, it's one of the commercial decisions that destroys the most margin in manufacturing.

Leer en español →

"At least it covers fixed costs" is one of the most common phrases when accepting a low-margin order. It's also one of the most dangerous, because it assumes plant capacity has no opportunity cost.

Every hour a machine spends producing a near-zero-margin job is an hour that isn't available for a high-margin job. If capacity were infinite, the rule would make sense. In practice, almost no plant has infinite capacity in its most constrained resource.

Why the rule seems right and isn't

The accounting logic behind "it covers fixed costs" is real: any revenue above variable cost helps absorb the plant's fixed structure. The mistake isn't in the logic; it's in what the logic ignores.

It ignores that the truly scarce resource isn't the whole factory, it's the machine or process acting as the bottleneck. A job can contribute positively on paper and, at the same time, tie up the five-axis center for hours that a job with higher margin density could have used.

The missing metric: margin density per constraint hour

The right question isn't whether a job covers fixed costs. It's how much margin it generates for each hour it occupies on the plant's most constrained resource.

Two orders can have the same percentage margin and still consume very different amounts of the plant's most valuable capacity. The one that uses fewer bottleneck hours per peso of margin generated is, in real terms, the more profitable job, even though they look identical in the traditional report.

What it looks like in practice

A reference example, not verified customer data, shows the difference:

OrderReported marginBottleneck hoursMargin per constraint hour
Order A18%12 hrs$410
Order B17%3 hrs$1,560

Both orders "cover fixed costs" with an almost identical reported margin. But Order B generates almost four times more margin per hour of the plant's scarcest resource. Accepting Order A when it competes for the same capacity as Order B is, in real terms, a decision that destroys value, even though the traditional report never flags it.

The fix isn't to reject every low-margin job

This isn't about eliminating every low-margin order. When the plant has real idle capacity in its constrained resource, that same order can be the right decision.

What changes is the acceptance criterion: before quoting or confirming an order, the question shouldn't only be whether the margin is positive, but whether that capacity, at that moment, has a better use available. That comparison requires knowing, with real data and not assumptions, which resource is currently the plant's constraint and how much margin per hour each product family is generating on it.

Klipos calculates margin density per constraint hour by connecting in read-only mode to the company's ERP and invoices, so the decision to accept or turn down a job is made with the real opportunity cost, not with the "at least it covers fixed costs" rule.